ERRICHTERBESCHEINIGUNG ELEKTROINSTALLATION PDF

Die Elektro-, Wasser- und Druckluftversorgung der Stände erfolgt in der Regel aus Elektroinstallation. Anschlüsse . Eine Errichterbescheinigung von . ausgabeaufschlag fonds beispiel hör elektro mannheim. sonderurlaub todesfall schwiegereltern momenti hofheim speisekarte Submitted by wie folgt aus. Elektro-, Wasser- und Druckluftversorgung im Freigelände. Errichterbescheinigung von der ausführenden Elektrofachkraft ist erforderlich, wenn.

Author: Shakora Zolora
Country: Turkey
Language: English (Spanish)
Genre: Education
Published (Last): 10 June 2005
Pages: 109
PDF File Size: 16.95 Mb
ePub File Size: 19.11 Mb
ISBN: 713-4-29929-114-2
Downloads: 64625
Price: Free* [*Free Regsitration Required]
Uploader: Nesar

Pc 9 9 9 4,5 ! The RAZ K has to be mounted in such a way, that it is easily accessible for the maintenance staff e. Actuate with smoke detector test control unit; the LED red on the detector is lit.

Check if all windows open and are opened all the way before closing the windows by pushing the Close button black in the fire pushbutton. Meldereinsatz entnehmen und reinigen.

HAUTAU RAZ K Rauchabzugszentrale

To guarantee a reliable emergency power supply, please check the used battery packs regularly and replace them if necessary. Observe all applicable VDE regulations. After 16 minutes the ventilation is released. Mortal danger to persons due to electricity! The mounting of the control unit has to be performed by trained, qualified and safety-conscious electrical staff acc. Pull off errichterbesdheinigung connecting plugs of the emergency power supply battery packs.

Close the central unit and switch the mains on. D und den Pluspol von Akku! Pa 70 N L! A modification of connections is allowed only within the bounds of connection options. The control unit correspond with the actual standard of technology. Bei Unstimmigkeiten informieren Sie umgehend den Lieferanten. Netzversorgung V AC einschalten und Akkus aufstecken. It’s a community-based project which helps to repair anything.

  MANUAL DE CONSTRUCCION DE EDIFICIOS ROY CHUDLEY PDF

All works at live components may be performed only by a skilled worker with completed professional training in the field of electrical equipment installation. Finish by checking all functions as elekteoinstallation as function and operation displays on the central smoke exhaust unit and the pivoting range of the drives.

Bei Wartungsarbeiten an der Zentrale trennen Sie diese mittels Trennvorrichtung allpolig vom Netz und sichern Sie erricnterbescheinigung vor unbeabsichtigtem Wiedereinschalten. Use suitable mounting material. When positioning the central unit and the pushbuttons, please follow all fire protection and state building regulations.

The wires are guided through the designated cable bushings from the top!

HAUTAU RAZ K Rauchabzugszentrale |

You have to use only original parts. Dispose of the battery packs in an ecologically desirable way acc. When installing the drives, please pay attention to the occurring forces. This is necessary to relate the connections correctly in case of replacing the circuit board.

Check the central unit functions properly after successful installation of all components fire errihcterbescheinigung, smoke or heat detector, drives, ventilation pushbuttons, etc. The wiring type must always be authorised by the responsible authority fire service, technical inspection, fire protection etc.

Functions Opening in the event of an emergency: Make sure to observe the maximum possible connection options of the control unit. In case of power failure, the emergency power supply guarantees the operation of the SHEV facility for at least 72 hours.

  DUMET 2010 RESULTS PDF

errichterbesdheinigung The battery packs must be replaced no later than every 4 years. Verwenden Sie nur Original-Ersatzteile. G with the positive pole of battery pack!

Crushing and cutting points! Smoke and heat exhaust ventilation systems must be serviced at least once a year by a specialised SHEV company with qualified staff and in accordance with all statutory regulations building code and state building regulations.

Manually by reset button inside the fire pushbutton. Switch on the V AC power supply on and slip on the battery packs. This must be located near the unit and easy to reach for the user. Push the alarm button red on the fire pushbuttons again to actuate the system. The red Flektroinstallation in the fire pushbutton and on the circuit board are lit. If other drives are used, refer to terminal connection diagram next page. For the wires bore the housing exclusively at the corresponding positions at back!

G auf den Pluspol von Akku! To prevent electric shock, connect the earth elejtroinstallation first before connecting any other lines such as the mains supply line or any external lines. Manuell durch Feuertaster, automatisch durch Rauch- und Thermomelder oder elektroinstallatoon Fremdansteuerung.

Author: admin